Industrial Process Plant Construction Estimating and Man-Hour Analysis
Industrial Process Plant Construction Estimating and Man-Hour Analysis
Click to enlarge
Author(s): Storm, Kenneth
ISBN No.: 9780128186480
Pages: xliv, 304
Year: 201905
Format: Trade Paper
Price: $ 181.84
Dispatch delay: Dispatched between 7 to 15 days
Status: Available

Industrial Process Plant Construction Estimating and Man-Hour Analysis focuses on industrial process plants and enables the estimator to apply statistical applications, estimate data tables, and estimate sheets to use methods for collecting, organizing, summarizing, presenting, and analyzing historical man-hour data. The book begins with an introduction devoted to labor, productivity measurement, collection of historical data, verification of data, estimating methods, and factors affecting construction labor productivity and impacts of data. It goes on to explore construction statistics and mathematical spreadsheets, followed by detailed scopes of work ranging from coal-fired power plants to oil refineries and solar plants, among others. Man-hour schedules based on historical data collected from past installations in industrial process plants are also included as well as a detailed glossary, Excel and mathematical formulas, area and volume formulas, metric/standard conversions, and boiler man-hour tables. Industrial Process Plant Construction Estimating and Man-Hour Analysis aids industrial project managers, estimators, and engineers with the level of detail and practical utility for today's industrial operations and is an ideal resource for those involved in engineering, technology, or construction estimation. Utilize day-to day worksheets to estimate equipment and piping for all process plants and power plant projects Identify quantity differences with the comparison method and eliminate impacts between proposed and previously installed equipment applicable for any complexity of design, bid, and contract Understand how to implement statistical and estimating methods, scopes of work, man-hour tables and estimate sheets to produce direct craft man-hour estimates, RFPs, and field change orders Set up and utilize Excel templates to automate statistical functions that will perform mathematical applications key to process plant construction.


To be able to view the table of contents for this publication then please subscribe by clicking the button below...
To be able to view the full description for this publication then please subscribe by clicking the button below...