The Messerschmitt 210/410 Story
The Messerschmitt 210/410 Story
Click to enlarge
Author(s): Forsgren, Jan
ISBN No.: 9781781557310
Year: 201910
Format: Trade Cloth (Hard Cover)
Price: $ 50.99
Dispatch delay: Dispatched between 7 to 15 days
Status: Available

In 1938, the Reichsluftfahrtsministerium (German Air Ministry, RLM), issued a requirement for a new twin-engine heavy fighter to replace the Me 110. This type of combat aeroplane was known as Zerstörer (Destroyer). The first prototype flew in September 1939. The Me 210 proved very difficult to fly, having numerous deficiencies. It was said to be deadlier to its crews than the enemy. Nevertheless, the Luftwaffe ordered the Me 210 into production. Operational trials began in late 1941, but it was eventually acknowledged that the aircraft had to be redesigned in order to be accepted into Luftwaffe service. The whole Me 210 debacle proved a huge scandal.


A redesigned variant, the Me 410 began to reach Luftwaffe units in mid-1943. Even if the Me 210 and Me 410 were similar in appearance, the latter had to be redesigned to avoid the extremely poor reputation of the Me 210. The Me 410 proved a quite successful aeroplane, being used as a heavy fighter and for reconnaissance duties. Its closest Allied equivalent was the British DH 98 Mosquito. More than 1,500 Me 210/410s were built in Germany and Hungary, with only two Me 410s surviving today.


To be able to view the table of contents for this publication then please subscribe by clicking the button below...
To be able to view the full description for this publication then please subscribe by clicking the button below...